Real thermoplastic playground markings installed on a school playground

Thermoplastic playground markings

A plain-English guide to the material itself: what thermoplastic is, how we heat-bond it to the surface, how long it lasts and why it keeps its grip and colour years after paint would have faded.

What are thermoplastic playground markings?

Thermoplastic is a hard-wearing marking material that is heated and bonded onto the playground surface, where it cools into a tough, anti-slip, coloured design. It is the same family of material used for road markings, which is why it stands up to constant footfall, PE and British weather far better than paint. Because it fuses to the tarmac rather than sitting on top, it keeps its colour and its grip for years, and it is the material we recommend and use for the great majority of school markings, from number grids to sports courts. They are one type of playground markings we design and install.

Why do schools choose thermoplastic playground markings?

Lasts for years

Bonded to the surface with heat, thermoplastic holds its colour and outline through constant use. Our thermoplastic markings carry a manufacturer's warranty of up to 4 years, subject to ground condition, and we have seen them last for over 10 years.

Anti-slip underfoot

The finish is textured for grip, so markings stay safe to run and play on even when the playground is wet.

Down and dry fast

It cools and cures within minutes, so a marking is walkable almost as soon as it is laid, and most primary schemes go down in a day.

What types of thermoplastic playground markings do we install?

What the material is, how it bonds to tarmac and how long it lasts.

Preformed thermoplastic

Ready-cut shapes and detailed designs heated onto the surface, ideal for intricate graphics and logos.

Screeded line markings

Melted and screeded lines for courts, tracks, roadways and grids that need crisp, straight edges.

Anti-slip finishes

Textured thermoplastic where extra grip matters, on tracks, ramps and busy routes.

Full-colour designs

Multi-colour educational and play markings built up in thermoplastic for depth and clarity.

How do we install thermoplastic playground markings?

Survey, design, install and aftercare, and most of it is ours to do.

  1. 01

    Survey

    We check the surface is sound, clean and dry enough to bond to, because a good thermoplastic finish depends on the tarmac underneath it being in decent order.

  2. 02

    Design

    We plan the markings and confirm the colours and layout, so you approve exactly what will be laid before we heat a thing.

  3. 03

    Install

    Our team preps the surface and applies the hot thermoplastic on site, either as preformed shapes or screeded lines, working around your school day.

  4. 04

    Aftercare

    The markings cure within minutes and are walkable once cool. We advise on keeping them clean and can repair or add to them years later.

What do thermoplastic playground markings cost?

Thermoplastic costs more per marking than paint at the outset, but it lasts up to 10 times longer than ordinary paint, so on a whole-life basis it is usually the cheaper choice for a school. Individual thermoplastic designs start from around £50, and a typical primary package runs into the low thousands. The figure depends on the designs, the area, the surface and access, so we survey and send a free design and a detailed quote, with no hidden costs and our price match promise.

Prices exclude VAT

Payment terms and any site-dependent charges, for example an aborted visit or extra cleaning, are set out in our terms.

Get a free design and quote

What is the specification for thermoplastic playground markings?

The key details for thermoplastic playground markings. We confirm everything on your design drawing.

DetailSpecification
MaterialHard-wearing thermoplastic
BondingHeat-fused to the surface
FinishAnti-slip, textured
WarrantyUp to 4 years, subject to ground condition
LifespanSeen lasting over 10 years
Cure timeWalkable within minutes of cooling
SurfaceTarmac or macadam, sound and dry

What do our thermoplastic playground markings look like?

A closer look at thermoplastic markings and designs like them on real school playgrounds.

More thermoplastic markings examples
  • 1 to 100 Snakes and Ladders thermoplastic playground marking at a UK school
  • Colour Creatures thermoplastic playground marking at a UK school
  • Active Zone thermoplastic playground marking at a UK school
  • Mile a Day Track thermoplastic playground marking at a UK school
  • 16 Point Compass thermoplastic playground marking at a UK school
  • 3 Way Hopscotch thermoplastic playground marking at a UK school
  • A to Z Caterpillar thermoplastic playground marking at a UK school
  • Circular Maze thermoplastic playground marking at a UK school

Thinking about thermoplastic markings for your school? See how our process works, from a free survey to install, meet the team behind your markings, or read reviews from schools we have worked with. For directional floor and site-navigation markings we also fit wayfinding markings.

Replacing tired markings? We also do safe marking removal and full-colour surface coatings.

Thermoplastic playground markings: your questions answered

What is thermoplastic and how does it work?

Thermoplastic is a marking material that is heated until it melts, then applied to the playground and left to cool, where it bonds to the surface as a tough, coloured, anti-slip design. It is the same family of material used for road markings, so it is built for heavy, constant use.

Is thermoplastic better than painted markings?

For most school markings, yes. Thermoplastic costs more up front but bonds to the tarmac and lasts up to 10 times longer than ordinary paint, holding its colour and grip through years of footfall and weather. Paint is cheaper initially and wears faster, so we usually recommend thermoplastic on the whole-life cost, and we will give you both figures.

How long before children can use thermoplastic markings?

Very quickly. Thermoplastic cools and cures within minutes of being laid, so markings are walkable almost as soon as they are down. That is a big part of why most primary schemes are installed in a single day with the playground back in use fast.

Get a free design and quote

Tell us about your playground and we will arrange a survey, draw thermoplastic markings around your site and send a detailed quote, with no hidden costs and our price match promise. There is no obligation. Prefer to talk it through?

0333 321 6699

We will call you back to talk it through. No obligation. Prefer to talk now? Call 0333 321 6699.

The experts behind your markings

The people who design, price and stand behind every Uniplay installation.

Michael Jarvie, Operations Director at Uniplay

Michael Jarvie

Operations Director · Director and Co-owner

One of our Directors and Co-owners, with over 16 years' experience in the playground markings industry and masses of industry knowledge. There is very rarely a thermoplastic query he cannot resolve.

Connect on LinkedIn
Victoria Walmsley, Sales and Marketing Director at Uniplay

Victoria Walmsley

Sales and Marketing Director · Director and Co-owner

One of our Directors and Co-owners, with a wealth of experience across all things thermoplastic, leading sales and marketing at Uniplay.

Connect on LinkedIn

Ready to get your playground moving?

Tell us about your space and we will send a free design and a detailed quote, with no hidden costs and our price match promise.

  • Free design and site survey
  • No obligation
  • Our own in-house installation team
Call 0333 321 6699Get a quote