We would like to use Google Analytics and Google Ads cookies to see how the site is used and how our adverts perform. We only set them if you accept. Read our privacy policy.
A plain-English guide to the material itself: what thermoplastic is, how we heat-bond it to the surface, how long it lasts and why it keeps its grip and colour years after paint would have faded.
Thermoplastic is a hard-wearing marking material that is heated and bonded onto the playground surface, where it cools into a tough, anti-slip, coloured design. It is the same family of material used for road markings, which is why it stands up to constant footfall, PE and British weather far better than paint. Because it fuses to the tarmac rather than sitting on top, it keeps its colour and its grip for years, and it is the material we recommend and use for the great majority of school markings, from number grids to sports courts. They are one type of playground markings we design and install.
Why do schools choose thermoplastic playground markings?
Lasts for years
Bonded to the surface with heat, thermoplastic holds its colour and outline through constant use. Our thermoplastic markings carry a manufacturer's warranty of up to 4 years, subject to ground condition, and we have seen them last for over 10 years.
Anti-slip underfoot
The finish is textured for grip, so markings stay safe to run and play on even when the playground is wet.
Down and dry fast
It cools and cures within minutes, so a marking is walkable almost as soon as it is laid, and most primary schemes go down in a day.
What types of thermoplastic playground markings do we install?
What the material is, how it bonds to tarmac and how long it lasts.
Preformed thermoplastic
Ready-cut shapes and detailed designs heated onto the surface, ideal for intricate graphics and logos.
Screeded line markings
Melted and screeded lines for courts, tracks, roadways and grids that need crisp, straight edges.
Anti-slip finishes
Textured thermoplastic where extra grip matters, on tracks, ramps and busy routes.
Full-colour designs
Multi-colour educational and play markings built up in thermoplastic for depth and clarity.
How do we install thermoplastic playground markings?
Survey, design, install and aftercare, and most of it is ours to do.
01
Survey
We check the surface is sound, clean and dry enough to bond to, because a good thermoplastic finish depends on the tarmac underneath it being in decent order.
02
Design
We plan the markings and confirm the colours and layout, so you approve exactly what will be laid before we heat a thing.
03
Install
Our team preps the surface and applies the hot thermoplastic on site, either as preformed shapes or screeded lines, working around your school day.
04
Aftercare
The markings cure within minutes and are walkable once cool. We advise on keeping them clean and can repair or add to them years later.
What do thermoplastic playground markings cost?
Thermoplastic costs more per marking than paint at the outset, but it lasts up to 10 times longer than ordinary paint, so on a whole-life basis it is usually the cheaper choice for a school. Individual thermoplastic designs start from around £50, and a typical primary package runs into the low thousands. The figure depends on the designs, the area, the surface and access, so we survey and send a free design and a detailed quote, with no hidden costs and our price match promise.
Prices exclude VAT
Payment terms and any site-dependent charges, for example an aborted visit or extra cleaning, are set out in our terms.
Thermoplastic playground markings: your questions answered
What is thermoplastic and how does it work?
Thermoplastic is a marking material that is heated until it melts, then applied to the playground and left to cool, where it bonds to the surface as a tough, coloured, anti-slip design. It is the same family of material used for road markings, so it is built for heavy, constant use.
Is thermoplastic better than painted markings?
For most school markings, yes. Thermoplastic costs more up front but bonds to the tarmac and lasts up to 10 times longer than ordinary paint, holding its colour and grip through years of footfall and weather. Paint is cheaper initially and wears faster, so we usually recommend thermoplastic on the whole-life cost, and we will give you both figures.
How long before children can use thermoplastic markings?
Very quickly. Thermoplastic cools and cures within minutes of being laid, so markings are walkable almost as soon as they are down. That is a big part of why most primary schemes are installed in a single day with the playground back in use fast.
Get a free design and quote
Tell us about your playground and we will arrange a survey, draw thermoplastic markings around your site and send a detailed quote, with no hidden costs and our price match promise. There is no obligation. Prefer to talk it through?
The people who design, price and stand behind every Uniplay installation.
Michael Jarvie
Operations Director · Director and Co-owner
One of our Directors and Co-owners, with over 16 years' experience in the playground markings industry and masses of industry knowledge. There is very rarely a thermoplastic query he cannot resolve.